CountryPlans Design/Build Forum Building & Design help for the involved home owner
July 30, 2010, 11:47:00 AM *
Welcome, Guest. Please login or register.
Did you miss your activation email?

Login with username, password and session length
News: Welcome to the Small Home & Cabin Design/Build Forum!
• Feel free to ask & answer questions about building smaller homes, cottages, and cabins.
No Advertising - You may post a web link in your profile.
• Signup for free and start posting. Click REGISTER.
• Click PROFILE SETUP to update your membership data.
• Click SEARCH to find a topic quickly.
• Click HOME to return to the main CountryPlans.com website and our PLANS.
 
   Home   Help Search Login Register  

Pages: [1] 2 3 4   Go Down
  Print  
Author Topic: DemianJ's 2-Str Universal in VA (New Pics 7/13/07)  (Read 88703 times)
0 Members and 2 Guests are viewing this topic.
DemianJ
Guest
« on: February 27, 2006, 10:05:45 AM »

Since I've received so much great information here, I've been meaning to post my project but have been too busy building.  The house is a 20x24 2 Story Universal (modified length with a full, walkout basement) being built about 30 mi N of Lynchburg, VA using a combination of free family help and hired carpentry friends.  I'm serving as the GC and semi-skilled labor and have enjoyed every minute of it.  It also doesn't hurt that, so far, the weather's been amazing for Feb.  We started framing 2 weeks ago and here's some pics of where things are at now.  I'll post more details later.

(Forum Admin Note: Added Owner Builder Gallery Page for this house 9-21-07.)

First off... here's a more recent photo to show you where this story and forum thread is headed:



Floorplans below then pictures of the framing.



















Thanks,
Demian
« Last Edit: September 21, 2007, 12:35:41 PM by jraabe » Logged
Jimmy_Cason
Guest
« Reply #1 on: February 27, 2006, 10:24:03 AM »

That looks very good! Keep the pics coming!
« Last Edit: February 27, 2006, 10:24:19 AM by Jimmy_Cason » Logged
glenn-k
Guest
« Reply #2 on: March 01, 2006, 09:15:32 PM »

Nice start -- I really like the scenery there.
Logged
jraabe
Guest
« Reply #3 on: March 02, 2006, 08:41:39 PM »

Lovely site and clean framing. Nice tidy plan.

You are getting some pretty nice weather considering it is still winter most places.
« Last Edit: March 02, 2006, 08:43:37 PM by jraabe » Logged
Boatz
Guest
« Reply #4 on: March 05, 2006, 08:28:08 AM »

I like your cabin and the way you have sited it - great views! Any chance you've got some elevations to post? I'd love to see what the exterior is going to look like...
Logged
DemianJ
Guest
« Reply #5 on: March 09, 2006, 04:29:54 AM »

Thanks yall for the good words.  The 2nd story walls go up today (so I get to see just how much of a tower it'll actually be).  We're beginning to wonder whether we'll have to rent a crane or extended forklift to get the trusses in place (any thoughts?).  I'll post some more pics soon.

Boatz, I'll post some elevation pics in the next few days.  I'm still trying to figure out how to blend the bumpout, front porch and upstairs balcony together in 3DHA.

Demian
Logged
Jimmy_Cason
Guest
« Reply #6 on: March 09, 2006, 06:04:32 AM »

What type of truss system did you decide to use?
Logged
DemianJ
Guest
« Reply #7 on: March 24, 2006, 09:22:07 AM »

Jimmy,

We ended up buying scissor trusses because the one's I was unable to get the VA paperwork for the one's I was given.  They'll probably be used in a outbuilding down the road.

We've got the 2nd story done and the house sheathed and wrapped and hope to raise the trusses and start siding next week.  I'll some more progress picks soon.

Logged
John_M
Guest
« Reply #8 on: March 24, 2006, 09:51:12 AM »

Would love to see the update...looks great so far!! Smiley
Logged
DemianJ
Guest
« Reply #9 on: March 25, 2006, 05:42:57 AM »

Here's the recent progress.  We're using the wall system labeled Wall 1 in this article. It turns out that we'll need to go back and cut the foam openings larger to allow the window flashing to connect with the Tyvek.

http://www.buildingscience.com/resources/walls/Guide_to_Insulation_Sheathing.pdf

I'll post some 3D renderings of the front of the house with the porches soon.













Note- rotated and resized picture- GK
« Last Edit: September 28, 2006, 06:33:37 AM by DemianJ » Logged
jwv
Guest
« Reply #10 on: March 25, 2006, 04:54:39 PM »

Jonquils sprouting, must be close to Easter.

judy

Your house is great!
Logged
DemianJ
Guest
« Reply #11 on: May 04, 2006, 06:30:36 AM »

Thanks JMV.

I never got around to reposting that 3d rendering so the current progress will give you an idea.  We're currently trying to figure out how to blend the bumpout, balcony, and front porch roofs and are currently leaning towards having the bumpout top touch the underside of the metal porch shed roof (which extends 6' out, has a 3/12 pitch, and goes all the way across the front).  Luckily, my carpenter is very patient with onsite architecture.

New house pics showing progress as of 4/1 (electrical, plumbing, roofing are being done this week):

Note the extended boom forklift getting stuck and almost sliding down the mountainside.

http:// www.demianbridgethouse.shutterfly.com

Password: virginia

DemianJ
Logged
Amanda_931
Guest
« Reply #12 on: May 04, 2006, 07:48:24 AM »

Ouch on the forklift.

I drove them for about 4 years.  Never the out-side capable ones, usually the little bitty narrow aisle reach trucks.  But in one training class they assured us that the 3-wheel types--the kind that ride on the back of block truck--were as stable as the 4, not any harder to overturn.  Even if your big sweetie was a four-wheeler.

But they are very very heavy for their size, have to be to counterbalance tons many feet in the air.  And working at capacity, not terribly stable.  I soon learned to work smoothly when my forks were up high.  Any kind of jerkiness when I had over a ton 18-feet up put me on three (of the four) wheels if not two.  And that was on flat dry concrete.  Never turned it over though.  Would have been easy.  We weren't supposed to take ours outside at all, but a lot of us did, and not infrequently, since these only powered (and steered) one wheel, had to be pulled or pushed out of a pothole under that one wheel.
Logged
DemianJ
Guest
« Reply #13 on: August 03, 2006, 12:48:57 PM »

Wow, it's been a long time since I updated my project posting.  

The porches are over half done, the sheetrockers finished yesterday and painting started today.  We're hoping to move out of the travel trailer and into the house in about 3 weeks.

Now if I can just find that camera cable.....

Logged
Jimmy_Cason
Guest
« Reply #14 on: August 04, 2006, 06:17:51 AM »

Quote
The porches are over half done, the sheetrockers finished yesterday and painting started today.  We're hoping to move out of the travel trailer and into the house in about 3 weeks.

Now if I can just find that camera cable.....


Demian, What a tease!  
I would really like to see those pics when you find the cable!
Logged
jraabe
Guest
« Reply #15 on: August 07, 2006, 12:58:39 PM »

Nice work!  [smiley=beer.gif]

Demian has sent me some updated photos. I will add a few here and he can comment if needed:


Exterior image - siding going up.


Front porch wraps around side.


Interior framing exposed.


Drywall in process.

« Last Edit: August 16, 2006, 07:22:36 AM by jraabe » Logged
MB25ACRES
Guest
« Reply #16 on: August 30, 2006, 09:42:45 AM »

dO you have any pics of the walkout side. pics of framing above door. what did that ad to the cost of the basement compared to reg basement. just wandering what basement cost. thanks Mike
Logged
Jimmy_Cason
Guest
« Reply #17 on: August 31, 2006, 12:09:13 PM »

That looks so good! It is amazing how fast your place is coming together.
Logged
DemianJ
Guest
« Reply #18 on: September 01, 2006, 02:23:49 PM »

MB,
I think I've got some pics of it somewhere.  The door opening wasn't actually framed; it's a rebar reinforced concrete header that they made using the forms they poured the walls with.  With the current price of concrete and steel, adding openings should offset any increased labor cost and will probably actually reduce the cost of a basement.  We also had a window opening in the same wall, so b/w the window and a double glass door the first half of the basement gets a good amount of light.

Jimmy,
Thanks.  We've brought on a bunch of subs towards the end to try and get things wrapped up.  I'm amazed you've been moving faster while doing everything yourself!

The siding was finished today in time for the torrential rain.  I should have papered the porch roof though.

DemianJ
Logged
MB25ACRES
Guest
« Reply #19 on: September 01, 2006, 03:30:33 PM »

Thanks Demian I think you have done a great job. very inspiring. I am still conviencing my wife we can do this. we already have land (not free and clear) but am not wanting to add much more to the financed amount. So I am hoping to have the basement poured with walk out. By the way how tall are the walls in the basement. I see that some builders are advertising deeper basements for more head room. not sure what is standard and can't remember what they are saying thier deeper basements are. I have a cousin that is an electrical engineer that I think will do the electric. I have another that is a roofer that I am hoping will atleast keep me sane. my Father-in-law is very handy so I think he would enjoy helping. enough rambling from me thanks for responding. thanks Mike
Logged
Pages: [1] 2 3 4   Go Up
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.11 | SMF © 2006-2009, Simple Machines LLC Valid XHTML 1.0! Valid CSS!