I passed my final inspection today on a modified version of the 20x30 1-1/2 story cabin. My father and I started building in January of last year. We did everything from the mudsill to the roof sheathing. First time building a house.

The house is 20x36 ft with 12 ft walls. Standard balloon frame. The kitchen and staircase was swapped for larger code compliant staircase. It has a utility room for washer and dryer with a back door.

Building in Shenandoah County Virginia.


Offline azgreg

  • Full Member
  • ***
  • Posts: 194
Re: Passed Final Inspection
« Reply #1 on: April 10, 2020, 06:17:41 PM »
Got pics?  :)

Offline westczek

  • Apprentice
  • *
  • Posts: 7
  • Welcome to the CP-Forum
Re: Passed Final Inspection
« Reply #2 on: April 10, 2020, 06:40:26 PM »
Yes. Just working out how to post. There was suppose to be a picture with the original post. Trying again. Below is the house with view of Little North Mountain.

Offline westczek

  • Apprentice
  • *
  • Posts: 7
  • Welcome to the CP-Forum
Re: Passed Final Inspection
« Reply #3 on: April 10, 2020, 07:06:10 PM »

Offline westczek

  • Apprentice
  • *
  • Posts: 7
  • Welcome to the CP-Forum
Re: Passed Final Inspection
« Reply #4 on: April 10, 2020, 07:18:59 PM »
There is a bedroom and full bath on the first floor. The second for has a bedroom, loft and half bath.


Offline azgreg

  • Full Member
  • ***
  • Posts: 194
Re: Passed Final Inspection
« Reply #5 on: April 11, 2020, 07:57:26 AM »
Looks very nice. Well done.

Offline NathanS

  • Senior Member
  • ****
  • Posts: 675
  • NY Mountains
Re: Passed Final Inspection
« Reply #6 on: April 11, 2020, 03:04:48 PM »
Congrats!

Great looking place. The 12 foot walls look like the way to go for 2nd story head room!

Offline westczek

  • Apprentice
  • *
  • Posts: 7
  • Welcome to the CP-Forum
Re: Passed Final Inspection
« Reply #7 on: April 11, 2020, 04:34:58 PM »
Thanks. The 12 ft walls give us 15 ft across with 5 ft knee walls and over 9 ft at the collar ties.

Offline Rys

  • Senior Member
  • ****
  • Posts: 203
  • Welcome to the CP-Forum
Re: Passed Final Inspection
« Reply #8 on: April 12, 2020, 06:53:48 AM »
Looks great! Would love to see more pictures.

Offline westczek

  • Apprentice
  • *
  • Posts: 7
  • Welcome to the CP-Forum
Re: Passed Final Inspection
« Reply #9 on: April 12, 2020, 08:10:45 AM »
Thanks. Here is a picture from the other side facing Paddy Mountain.


Here is a picture of loft and bedroom while installing insulation.


This showes the 2x12 rafters and 2x6 collar ties.

 

Templates: 5: index (default), Ads (default), Portal (default), Display (default), GenericControls (default).
Sub templates: 12: init, html_above, adsheaders_above, body_above, adsindex_above, portal_above, main, portal_below, adsindex_below, body_below, adsheaders_below, html_below.
Language files: 3: SPortal.english (default), index+Modifications.english (default), Ads.english (default).
Style sheets: 1: portal (default).
Files included: 37 - 1132KB. (show)
Cache hits: 13: 0.00156s for 40,764 bytes (show)
Queries used: 29.

[Show Queries]