1 1/4 PEX vs 1 1/4 Black Poly

Started by TBA, May 31, 2008, 11:57:37 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

TBA

Redroverfarm, it slipped right over both pipes without a lot of jiggling (little bit).  Glad I used the corrugated now, it laid everything right down into the trench bottom.

Thanks again.





Shading by hand, halfway there, still to go over top is 4" of codeboard and the a layer of old planks to keep the big rocks from crushing the Big-O.