here's the lastest.....and some interior pics i had promised a while back. sorry it took so long to post.
(http://img256.imageshack.us/img256/2532/hpim08335hs.jpg)
(http://img256.imageshack.us/img256/1856/hpim08204cc.jpg)
(http://img256.imageshack.us/img256/6585/hpim08372xo.jpg)
(http://img256.imageshack.us/img256/6273/hpim08235sj.jpg)
(http://img256.imageshack.us/img256/1772/hpim08258ru.jpg)
Nice ;D
Great shots. The work is coming along great. The pictures have me wanting a second floor now.
Laura
Looking Good. This is the stairway I have in my house. Works great and it's easy to build.
Here is a link to the plans if anyone is interested.
http://www.jshow.com/y2k/listings/57.html
And the roof is coming along!
You've got a nice pastoral view from up on the roof!! Speaking of the roof, can you tell me what kind/brand of roofing you're using? It's got a nice deep profile that almost looks corrugated from a distance but obviously it's not.
it's called u-panel. we had to become familiar with the varied terminology used in the metal roofing industry, but all places call this stuff u-panel. and if you are considering using it, i suggest you buy it NOW!! we used the same stuff 2 yrs. ago on our old house and it was half the cost of it's current price!!! we couldn't believe it, but it's still better than shingles. we spent $1900 and that includes our industrial box gutters. hope this helps. monica
Yep, it does, I searched and got quite a few hits, thanks.
this is finished with box gutter
(http://img399.imageshack.us/img399/5281/hpim08403vd.jpg)
it took matt 5 hrs to lay 2 sheets by himself. when his friend showed up to help it took them 3 hrs. to finish this side.it's nice to have friends that aren't afraid of heights :) they spent 4-6 hrs yesterday screwing down the hat tracks/ sub girt. today they will finish the north side and ridge cap. then all we need is to finish the hardi and a few windows and we'll be dried in.
Looks great, Monica. Great job in good time, too.