Finally at the point where I'm ready to order materials to frame up my cabin. ;D
Putting the list together and I can see I'm gonna be broke and worn out by the time I get it all out to the site.
The plan is to get delivery to my house in late winter and then trailer up the ice road to my site where I will have to haul it with a snow machine up the hill to where I'm building.
I managed to get my dock all built this summer as well as a little tree clearing for the trail from lake to cabin.
The dock made it through some pretty big storms with no issues. I have a set of mooring whips to install in the spring to save my boat from bouncing off the dock when it gets rough.
(https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-xpa1/v/t1.0-9/10489825_940612742631732_5892758920879273017_n.jpg?oh=3e6017639eb40ccc02714c5b454e31a5&oe=5506F5BC&__gda__=1427514884_b5097a83cb6ca2cd2015da0158b8c672)
(https://scontent-a-pao.xx.fbcdn.net/hphotos-xaf1/v/t1.0-9/10525792_951788374847502_7037097232034079032_n.jpg?oh=42e0fc3c028bfa2c168ed16530a43f85&oe=54D23AC9)
(https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-xaf1/v/t1.0-9/10563186_941130779246595_790222345162119756_n.jpg?oh=2545fde2db17bf610ef6cabdcab2abec&oe=5518587B&__gda__=1426348293_7a6443a49ea80bc36f802b48e4155109)
What a lovely location!