Well, it still hasn't fallen over. The outside is complete except for soffits and spouting. The inside is complete except for the bathroom fixtures. The well driller will be here Wednesday morning. We plan to move in sometime in August.
We have built the entire house excluding well, septic, and land for aroun $17,000.00. We can't wait to get move it.
Tim and Leslie
(https://i1111.photobucket.com/albums/h473/deepwaters2/013.jpg)
(https://i1111.photobucket.com/albums/h473/deepwaters2/008.jpg)
(https://i1111.photobucket.com/albums/h473/deepwaters2/008.jpg)
(https://i1111.photobucket.com/albums/h473/deepwaters2/020.jpg)
(https://i1111.photobucket.com/albums/h473/deepwaters2/28994_3.jpg)
(https://i1111.photobucket.com/albums/h473/deepwaters2/28941_2.jpg)
[cool]
Cool looking place a quite a price too!
Nice looking exterior Tim. I want to use board and battens also and want my deckimg to look similar also. Nice job.
I started putting in the bathroom fixtures last night, and uncovered the floor. Late afternoon, the well drill showed up to set up the rig and should start drilling the well today.
(https://i1111.photobucket.com/albums/h473/deepwaters2/013-1.jpg)
(https://i1111.photobucket.com/albums/h473/deepwaters2/028.jpg)
(https://i1111.photobucket.com/albums/h473/deepwaters2/024.jpg)
Tim
Tim - your place really looks good.