Hi everyone....I have been contemplating a project of my own for some time and I am slowly putting the pieces together. I have not settled 100% on a floor plan but I think i'm going to work within the 24 x 40 size.
Anyhow, I've been getting some estimates for a dried in shell as I probably would take forever to finish it. Talked to a highly recommended Amish builder this weekend. His crew is well known for their masonry. He gave me a rough guesstimate price to dry-in a 24x40 including full block basement of approx $15000 labor and material. Now this is just under roof, housewrap over osb sheathing, waterproofing of outer block wall. Not including excavation either of course.
Does this sound like a good deal assuming the quality is at least at par?
I would say absolutely, if i could get that price I would JUMP on it. I plan on a 24 x 32 with walk out basement, with contractor prices, materials alone are 14K plus.
nysono, thanks for the reply!
As far as I can tell, if I were to pay retail for the materials alone I came up with about 11k. Now, this doesn't include windows/doors/interior wall framing/insulation etc. Just outside shell, sheathed, under roof (steel), wrapped.
And, if I hired out a poured basement, my cost for that plus framing material looks like about 15k.
But it kinda makes sense to me because the Amish "working foreman" commands $15 per hour and his younger, strong helpers get around $10 per hour. So, combined $35/hour for 3 man crew, let's round up to $300.00 per 8 hour day. $1800 per 6 day week. So this works out to (2) 6-day weeks and change. Sounds like they should be able to get this done in that time frame.
PS of course neither of these figures include a poured floor in the basement- add another $4000.00 for that!
Sounds like a good deal to me. But the devil is always in the details. Get a written, detailed, quote in writing. Good luck. And post pics. ;D
Sounds like a bargain to me.
Thanks for the replies....unfortunately the Amish fellow I talked to pretty much just works by the hour, so a written contract probably won't work. But, I have a few references that have nothing bad to say about him, say he is a straight shooter, etc.
I had originally wanted to do a simple, earth sheltered block (maybe dry-stack) home, but when I look at the somewhat minimal extra cost for a framed "second floor" I'm thinking I'd be better off doing a "normal" home with a regular walkout "non-living" basement. But still apply solar gain principles and try to super-insulate and seal er up tight.
It seems what started as a very simple plan continues to get more complicated. All I want is the most "bang for the buck" but I need to find somewhere to draw the line.