4x6 braces

Started by astidham, July 09, 2010, 12:03:27 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

astidham

my 20x30 plans call for 4x6 bracing from the post to the beam
in the plan it calls out 1/2" lag screws to connect the brace to the post and beam.
I was going to use ring shank nails for this, I can put multiple nails in contrast to the screws.
would this cause a future problem?
"Chop your own wood and it will warm you twice"
— Henry Ford

John Raabe

Sure, use lots. 6-8 is about equal to a lag.
None of us are as smart as all of us.